Foot height main beams in the upper leg jeans that sit high on the bridge girder bridge is a suitable system for concreting. In this system, any scaffold system installed in the lower leg jeans mold and die without the help of hydraulic equipment in the upper leg jeans removed the upper leg jeans are placed on bracket feet higher elevations where the mold and the concrete is poured. mold again lowered the hydraulic system with a lower level after the completion of the leg work on concrete and concrete setting time. In this system, a minimum of labor is carried out via a secure high-speed production systems. Panel Machinery has created this system to companies in Turkey until the highway construction.
Prestressing SYSTEM AND PATTERNS
Production of bridge beams in this system, hollow core slab production with wide-span viaduct desired tension in torque for the heck is placed into the concrete beam and drained mAsIndAki hydraulic stretching equipment we use formed that in the system of German PAUL company purchased from Paul with a collaboration with edilir.dig equipment and molds panels are manufactured by machine.